Wednesday, December 17, 2014

Metal and Tile Work

The countertops are in! Below is a picture of the island in the kitchen.


Here is a shot of the guest bath.


The metal guys have been busy. Over the past week, the steel railings and the brackets to hold the treads were installed. We were able to use recycled wood for the treads. The piece of wood in the below photos has not been finished yet. Can you spot the dog?



The final pieces of metal were installed on the chimney, and if you look closely, you can see the wire loosely strung along the railings. If you look even more closely, there is a dog trying to get in the front door. :)


The title guys have also been busy. The below is an action shot of tile being installed in the master bath. We used a large format tile (12" x 24") to cover the entire south wall of the bathroom.


The below was one of Tim's more artistic images that we had to include. He sent this so that we could confirm the color of the grout. Nice pic, Tim!