One of the most significant developments over the last two weeks was the install of the cabinets. The kitchen, master bath, guest bath, master bedroom, and media room all had cabinets. They still need work, but we were able to get a good idea of how they looked.
Kitchen:
Master bath:
Master closet (still missing the draw faces on the lowers):
Media room:
Painting is well underway too. We spent many many hours picking the most amazing shade of white: super blanco. It's not just white, it's super white. Here is a pic of the dining area.
The tiling crew has finished their prep work and should be installing tile very soon. The below is a shot of the shower in the master bath. The entirety of the south wall in the master will be tiled.
The fireplace is installed but still waiting for its steel surround.
Perhaps the surprise favorite on this last trip was the metal work for the stairs. The steel stringers are looking great! We are very happy with how they turned out and can't wait to see how the wood treads finish the look.
There was a pretty good snowstorm on this last trip, but Olive didn't seem to mind.