Over the past two weeks a ton of work was completed. Now that the windows are installed and roof is on Big Valley Builders can start hanging the siding. For most of the exterior of the house we chose a cold-rolled steel panel that will require pretty much zero maintenance. The panels arrived silver and shiny and over the last week BVB treated it so that it rusts. Things seem to rust in the Valley quickly and they were able to get a nice patina in just a few days. Below are a few shots of the roof, the panels sunbathing, and the metal installed.




 

We are feeling really good about this material selection. While BVB worked on the siding outside, the entire house was insulated and work on the septic system was under way.




The floors are currently being prepared for the installation of the wiring for radiant heat. The cement should be poured in the next week!