We met with Tim to finalize a number of material selections and discuss the excavation that was set to begin the following week. Our meetings with Tim went great, and we left the Valley excited that the project would begin the following week...
Then a curve ball arrived two days before the excavator was set to begin. It has been a crazy few weeks and we have had to be very flexible to keep the project moving in the right direction. After a number of ups and downs, we are back on track with a solid plan and approach to getting the cabin built.
No comments:
Post a Comment