Below are a few updated renderings. The new renderings reflect our recent decision to move away from the orange tones of Cor-ten siding. The steel shown is still not exactly the color we are looking for, but it is getting closer. The new renderings also show metal railings, instead of cement, as well as a metal roof.
Friday, October 12, 2012
Tuesday, October 2, 2012
1st Design/Construction Issues
In mid-September we had a very productive meeting with our architect Ryan and Joel from Modern Shelter. We were (still are) trying to decide on exterior materials and discussed a number of different options. We are leaning towards materials that require minimal to no maintenance. Cement, metal, and glass are the big winners, but we still need to get more specific on the exact materials and their location on the house.
This is where we ran into the first of our design/construction issues.
First, the cement wall detailing the entryway may be difficult to construct as it is currently drawn. Right now the cement wall is a shared interior/exterior wall, which means it needs to be insulated. Nice to look at, tricky to pull off. We are tossing around a few ideas, including faking the cement on the interior side, but we may ultimately lose the cement on the interior...bummer.
Second, the roofing system called out in the plans (single ply) is not attractive. At all. It actually resembles duct-tape. This wouldn't be an issue if our roof wasn't very visible, but the roof is going to be extremely visible. The road to access the property is above the building site (i.e., you will see the roof every time you approach the house). We don't want to lose the very cool butterfly roof, so needless to say, we are reviewing other roofing options.
We left the meeting with a few things to think about, but also with a number of nice renderings of the project. The visuals were great--they allowed us to review a number of exterior materials and get a sense of what they would look like on the house. We are really happy with how the cabin looks.
This is where we ran into the first of our design/construction issues.
First, the cement wall detailing the entryway may be difficult to construct as it is currently drawn. Right now the cement wall is a shared interior/exterior wall, which means it needs to be insulated. Nice to look at, tricky to pull off. We are tossing around a few ideas, including faking the cement on the interior side, but we may ultimately lose the cement on the interior...bummer.
Second, the roofing system called out in the plans (single ply) is not attractive. At all. It actually resembles duct-tape. This wouldn't be an issue if our roof wasn't very visible, but the roof is going to be extremely visible. The road to access the property is above the building site (i.e., you will see the roof every time you approach the house). We don't want to lose the very cool butterfly roof, so needless to say, we are reviewing other roofing options.
We left the meeting with a few things to think about, but also with a number of nice renderings of the project. The visuals were great--they allowed us to review a number of exterior materials and get a sense of what they would look like on the house. We are really happy with how the cabin looks.
Thursday, August 30, 2012
Living and Ground Level Plan
After working and reworking the floor plan layout numerous times, we have come up with a plan that looks great and should have an excellent flow. Trying to keep the square footage down forced us (mainly Ryan) to come up with solutions to a variety of issues, including orientation of the kitchen and living room towards the views, proper placement of the powder room, and the location of the pantry. But we (mainly Ryan) figured it out!
We are happy with the layout and looking forward to selecting materials.
We are happy with the layout and looking forward to selecting materials.
Friday, August 17, 2012
Early Renderings
In late June we had another productive meeting with Ryan. There are still a few details to work out, but the overall concept is falling into place.
Below are a few preliminary renderings Ryan provided us. Next steps are to finalize the layout and begin to select materials.
Below are a few preliminary renderings Ryan provided us. Next steps are to finalize the layout and begin to select materials.
Thursday, July 19, 2012
Refining the Concept
In mid-June we sat down with Ryan for another design meeting. Meeting with Ryan in closer succession has really made the process more fluid, and we have been making steady progress.
While many of the ideas from the initial drawings have remained, in the below images, a few new concepts have emerged. There is now a small glass hallway that separates the master bedroom from the main living area. The master bedroom has been bumped out to accentuate the views of the mountains and provide for a more modular feel to the home's profile. There is also a slick window in the master bath that will accommodate views while in the tub.
The kitchen has been moved forward, pushing the dining room to the back portion of the house. The kitchen has a huge island and is oriented to capture the views. Moving the dining room was an easy choice because we will spend way more time in the kitchen.
The lower level has also been modified to provide for a large media room and spare bedroom.
We are very happy with the new design additions! We are still considering a few more details related to the floor plan but are getting very close to finalizing the concept.
While many of the ideas from the initial drawings have remained, in the below images, a few new concepts have emerged. There is now a small glass hallway that separates the master bedroom from the main living area. The master bedroom has been bumped out to accentuate the views of the mountains and provide for a more modular feel to the home's profile. There is also a slick window in the master bath that will accommodate views while in the tub.
The kitchen has been moved forward, pushing the dining room to the back portion of the house. The kitchen has a huge island and is oriented to capture the views. Moving the dining room was an easy choice because we will spend way more time in the kitchen.
The lower level has also been modified to provide for a large media room and spare bedroom.
We are very happy with the new design additions! We are still considering a few more details related to the floor plan but are getting very close to finalizing the concept.
Saturday, July 14, 2012
2nd Design Meeting | Initial Concept
In mid-May we had our second design meeting. Needless to say, it felt like an eternity between having our initial meeting with Ryan and having our follow-up to see the first concepts of the cabin.
Below are a few images from Ryan's initial design. While there was somewhat of a tense moment after Ryan showed us the concept--K did not make a sound and did not appear to be breathing--we were very happy with this first go-around. We particularly liked the floor plan's open concept with tons of windows, the floating roof and roof lines, the use of thick cement walls, the entryway and roof overhangs, and the bermed-in lower level with the ceiling acting as a cement deck off of the living room.
However, there were a few areas that needed work. We are in the kitchen a ton and wanted that area moved forward to take advantage of the views. We also felt like the master bedroom was not separated enough from the main portion of the house. The lower level layout also need to be modified to reflect our usage.
Overall, it was a good starting point, and we were looking forward to our next meeting and continuing the design process.
Below are a few images from Ryan's initial design. While there was somewhat of a tense moment after Ryan showed us the concept--K did not make a sound and did not appear to be breathing--we were very happy with this first go-around. We particularly liked the floor plan's open concept with tons of windows, the floating roof and roof lines, the use of thick cement walls, the entryway and roof overhangs, and the bermed-in lower level with the ceiling acting as a cement deck off of the living room.
However, there were a few areas that needed work. We are in the kitchen a ton and wanted that area moved forward to take advantage of the views. We also felt like the master bedroom was not separated enough from the main portion of the house. The lower level layout also need to be modified to reflect our usage.
Overall, it was a good starting point, and we were looking forward to our next meeting and continuing the design process.
Topo
Before Elemental could begin designing, we needed to obtain a topography (aka topo) of the land.
The topo would be used by Ryan for designing and modeling purposes. In early March we retained Tackman Surveying to do the job. Bill Tackman has been surveying land in the Valley for years. As soon as the snow melted, he was going to complete the topo. By late April the topo was completed. Bill and his crew did the job fast and for a fair price.
The topo would be used by Ryan for designing and modeling purposes. In early March we retained Tackman Surveying to do the job. Bill Tackman has been surveying land in the Valley for years. As soon as the snow melted, he was going to complete the topo. By late April the topo was completed. Bill and his crew did the job fast and for a fair price.