The wood exterior siding has been installed and matches well with the windows and metal.
With the exterior siding very close to completion on the house, Tim and Co. began installing the soffit. Looks good!
Pouring the cement floors upstairs and on the deck was an important milestone that had to be met before more work could begin on the interior of the building. With that out of the way, the next couple of weeks should bring a flurry of work: soffitt inside, drywall, stairs, etc. Here's a first look at the interior railings.
This last one is shows the some of the finished floor and interior railings.